EnergyAustralia has a 20% equity share in the Narrabri Gas Project, which contains a 2C contingent resource of up to 1,200PJ. The project is operated by Santos, an experienced coal seam gas developer and operator.
EnergyAustralia has a 20% equity share in the Narrabri Gas Project, which contains a 2C contingent resource of up to 1,200PJ. The project is operated by Santos, an experienced coal seam gas developer and operator.
Gas Infrastructure
Gunnedah Basin, New South Wales, Australia
PEL238 Joint Venture